Canadian Natural Resources Ltd.

  • 2005 - Fabricate, assemble, and installation of 51 Pipe rack modules, and 40 finger rack modules

Syncrude Canada Ltd

  • 2003 - Aurora Intersite Pipeline Project: Replace 6.6 km of 36" CS Pipe

  • 2001 - Maintenance Contract: Install/Remove/Replace/Rotate all Tailings lines (65 km).

  • 2000 - Composite Tailings Piping Project: Installation of 21 km. of 24"/28" CS Pipe; Installation of 3 km. of 36" HDPE Pipe; Installation of 3 km of 8" HDPE Pipe; 4" Glandwater Line; Installation of 4 km. of 4" HDPE; Tailings Maintenance
    Removal/Replacement of 5 km of 24"/27"/28" Tailings Lines.

  • 1999 - Composite Tailings Piping Project: Installation of 15 km 24" & 28" CS Pipe,
    1.3 km of 42" CS Pipe, 3 km of 42" HDPE Pipe (buried), & 1 km of 12" HDPE Pipe

  • 1998 - Composite Tailings Piping Project: Install 3 km. 52" dia. buried HDPE and 48" dia. Buried; CS pipe and 9 km. 42" dia. buried HDPE pipe; remove/replace 4.5 km. 24"/28" dia. Carbon Steel pipe; remove/replace 4.5 km. 24" dia. Naspipe

  • 1997 - Tailings Excellence Piping Project: Remove/Replace 56 km. of 24"/28" dia. CS Pipe Naspipe. North Mine Hydrotransfer Project: Install 9 km. Of 27" dia. CS Pipe

  • 1996 - 791 Pumphouse Extension: Install 1.5 km. 24" dia. CS Pipe

  • 1996 - Water Recycle Project: Install 1.5 km. 54" dia. CS Pipe; North Mine Project - Phase I: Install 4.5 km. 36" dia. CS Pipe

  • 1995 - MFT Project: Install 2 km. CS Pipe

Albian Sands Energy Inc.

  • 2003 - Albian Reclaim Waterline #2: Installation of 4.75 km of 36"HDPE
    (Plastic Pipeline). Albian Reclaim Waterline #1: Installation of 4.2 km of 26" HDPE
    (Plastic Pipeline)

  • 2002 - Maintenance Contract: Install/Remove/Replace/Rotate all Tailings lines.

  • 2002 - Cimarron Engineering: Simmons AOSPL Heavy oil line 3 km of 24" CS Pipe

Suncor Energy Inc.

  • 2001 - Maintenance Contract: Replace Misc pipe and pipe spools

  • 2000 - Milennium Expanion Project: Install 4", 6", 20", 28", 30" and 36" CS Pipe;

  • 1995 - Dyke 8 Return Water Line Project: Install 1.5 km. 24" dia. CS Pipe. 24" Consolidated Tailings Pipeline: Install 1.5 km. 24" dia. CS Pipe

  • 1998 - Steepbank Mine Piping Project: Suncor/Bantrel/UMA alliance; Install 4.5 km. 30" dia. CS Pipe, 13.5 km. 26" dia. CS Pipe, 4.5 km. 10" dia. CS Pipe and 9 km. 4" dia. CS Pipe

  • 1997 - Remove 1.5 km. of 36" dia. CS pipe: Barge #3 Relocation Project: Move 400 ft. of 24" dia. and 900ft. of 36" dia. and string along with 3700 ft. of 36" dia. CS Pipe

Ledcor Inc.
Aurora Intersite Pipelines Installation: 9 km of 30" & 36" CS Pipe

Colt/PetroCanada
Foothills DE/RE to Empress Plant Pipeline Install 1.2 km of 36" CS Pipe (buried) under 27 Line Crossings

Cimmaron Engineering Ltd.
Liesmer/Liege Compressor station relocation Project

Colt Engineering Ltd.
Express Pipeline Project: Fabricate 26 - 24" dia. Test Heads and Test Caps